# Kowloon Canton Railway. British Section. Estimate.
Main Head Sub. Head Bridges. Winer Bridge No.31. Work One 73 ft. Arch at chain. Item DESCRIPTION quantity Unit Rate AMOUNT 1 Excavation in foundations 10,100 10/ $101.00 2 Timbering and strutting 3 Concrete in foundations 300 30/- $7,300 4 Masonry in superstructure 1,732 3,000 5 Masonry in Arch 1,800 08 $1,440 6 Masonry in coving 140 10/ $8.00 7 Dry stone backing 2,800 Total $8,431.00 Contingencies 10% $843 Grand Total $9,274.10Page 116
..
Ati
.gewlish notneƆ noolwo
ل الزمن
16
PECIIOM"
HEITIЯa
.3TAMIT23
.K.4.0 gr buny
ZOITTAA
#
fous C.R E. No. 24.
Kowloon Canton Railway.
115
BRITISH SECTION.
ESTIMATE.
bвзH nist
broll due
Main Head
Sub. Head
Bridges.
Winer Bridge No.31.
Ano'k
Work
One § ft. Aroh at chair. 73*200 Drawing C.R.E.N¢.
ل طريق
quantity.
DESCRIPTION.
AMOUNT.
Rate. Unit.
Cts.
OC
10,100 Excavation in foundations
10/
ł
101 00
18 MAT
**
Item Tiahoring and passing.
300
0:
I
Concrete in foundations.
.37
Šimun data pie et vie w
30/-
$
7,300
Hanointy in muperstructure
1,732
3,000
LADESHA Ak et, peak
08
1,800 Masonry in Arch.
ak
200
*
R
140
Wasonry in coving.
10/
$8 00
8 8 8 8 8 8
00
food art
2,800 Dry stone backing.
IBJOT
Total
431 OC
Of zɔtɔnignitno)
lamoT bami)
Contingincies 10%
Grand Total
843
9,274 10